Message boards :
Science :
Tasks Dissapearing?
Message board moderation
Author | Message |
---|---|
Send message Joined: 15 Sep 20 Posts: 2 Credit: 4,580 RAC: 0 ![]() |
When i look at my tasks i see them disappear after a day, Is this a normal procedure or are they unneeded? |
Send message Joined: 7 Apr 20 Posts: 535 Credit: 1,310,046 RAC: 873 ![]() ![]() ![]() |
Normal procedure at most projects is to purge the completed task list after 24 hours from being returned to the project. Your do not loose any credit/points. It keep things tidy and is used to prevent overload the database server and keep page load time to a minimum. ![]() ![]() |
© 2019-2025 iThena. All rights reserved. | Private Policy