PERF tasks rarely sent but server status shows many ready to send (400,000).
Maybe the huge number is causing feeder issues.


This, or maybe constant "out of disk space" -problem. Feeder can load tasks to send them... Or that server doesnt have enough capacity to keep feeder loaded... Constant lags seen here.
2) Message boards : Number crunching : Unable to get work for the OONI Probe (Message 1602)
Posted 24 Aug 2022 by WezH
Post:
I do get tasks, but if You have Cnode running, Boinc won't ask more work. You have to manually update project to get Ooni tasks.
3) Message boards : Number crunching : Unable to get work for the OONI Probe (Message 1591)
Posted 9 Aug 2022 by WezH
Post:
Still no OONI.

Paul.

Something NOT right with Scheduler... NEEDS A BIG KICK!
Thena OONI Probe Tasks Available: 13486 Task In Progress: 513 Runtime of last 100 tasks in hour: --- Users in last 24 hours: 0


Working currently.
4) Message boards : Number crunching : Server is out of disk space (Message 1568)
Posted 17 Jul 2022 by WezH
Post:
Still "No space left on server"
5) Message boards : Number crunching : Server is out of disk space (Message 1555)
Posted 11 Jul 2022 by WezH
Post:
Still full
6) Message boards : Number crunching : Server is out of disk space (Message 1554)
Posted 10 Jul 2022 by WezH
Post:
Full
7) Message boards : Number crunching : Server is out of disk space (Message 1535)
Posted 18 Jun 2022 by WezH
Post:
Seems to be working now, but how long?
8) Message boards : Number crunching : Server is out of disk space (Message 1529)
Posted 17 Jun 2022 by WezH
Post:
Now over 48 hours...
9) Message boards : Number crunching : Server is out of disk space (Message 1514)
Posted 12 Jun 2022 by WezH
Post:
Now going on 6 hours of full disk in server.


plus 16 hours.
10) Message boards : Number crunching : Server is out of disk space (Message 1501)
Posted 7 Jun 2022 by WezH
Post:
Still full...
11) Message boards : Number crunching : Server is out of disk space (Message 1481)
Posted 22 May 2022 by WezH
Post:
Sun 22 May 2022 09:03:37 AM EEST | iThena.Measurements | [error] Error reported by file upload server: can't write file MAP_SERIES_2_1653139801_27279_1000_0_r199236930_1: No space left on server
12) Message boards : Number crunching : Server is out of disk space (Message 1428)
Posted 14 Feb 2022 by WezH
Post:
14/02/2022 05:55:00 UTC | iThena.Measurements | [error] Error reported by file upload server: can't write file PERF_TESTS_0D_T1644816601_210079_2_30_0_r1643711471_0: No space left on server
13) Message boards : News : Application: iThena OONI Probe (Message 1314)
Posted 6 Oct 2021 by WezH
Post:
No. This is just a test setting.
To be safe, I gave more - 2048 MB.
Ultimately it will be set to a smaller value ;)
Now only tests.

I have received OONI information based on which I will set the client RAM requirement for the iThena-ooniprobe application to 256 MB.
According to preliminary estimates, it should be fine.


When it's gonna change to smaller value? Still 2048
14) Message boards : News : Application: iThena OONI Probe (Message 1257)
Posted 19 Sep 2021 by WezH
Post:
Tasks		Elapsed 	Progress	Time Left
3		1d 02:07h		15.8%		~5d 18:18h
7		1d 02:00h		14.0%		~6d 14:00h

In last ~4 hours progress dropped from ~85% to ~15%, estimated time increased by several days. Need to shutdown hosts in ~4 hours, so these won't be finished.

For single 1.04 task

Tasks		Elapsed 	Progress	Time Left
1		8:52h		60.0%		~5:55h
15) Message boards : News : Application: iThena OONI Probe (Message 1256)
Posted 19 Sep 2021 by WezH
Post:
19 Sep 2021, 8:42:48 UTC

Tasks		Elapsed 	Progress	Time Left
1		17:28h		42.4%		~23:43h
3		16:42h		37.4%		~1d 03:00h
7		16:33h		35.6%		~1d 05:54h


Update, 10 v1.02 tasks are still under progress:

Tasks		Elapsed 	Progress	Time Left
3		22:52h		87.4%		~03:15h
7		22:44h		85.7%		~03:47h


In ~6 hours progress andvaced over 40%, previous 40% took 16-17 hours. Estimated time dropped over 20 hours in 6 hour period

For single 1.04 task

Tasks		Elapsed 	Progress	Time Left
1		5:44h		30.0%		~13:23h
16) Message boards : News : Application: iThena OONI Probe (Message 1251)
Posted 19 Sep 2021 by WezH
Post:
Should I abort them for new version or keep going?

A very good question.
I would not kill this job.
I can see the progress bar in this job is working properly (is it growing all the time?).
The question is, will he finish the job in 72 hours? Maybe it is possible ...
The current version for new jobs is v1.04.


Ok, I will let 10 of those 1.02 run until end (hopefully)

Aborted one task to get ver 1.04, it has been running now for 35min, progess has been 100% all time, no estimated time available.
17) Message boards : News : Application: iThena OONI Probe (Message 1249)
Posted 19 Sep 2021 by WezH
Post:
Those 11 tasks are still under progress:

Tasks		Elapsed 	Progress	Time Left
1		17:28h		42.4%		~23:43h
3		16:42h		37.4%		~1d 03:00h
7		16:33h		35.6%		~1d 05:54h


Should I abort them for new version or keep going?
18) Message boards : News : Application: iThena OONI Probe (Message 1243)
Posted 18 Sep 2021 by WezH
Post:
11 tasks under progress:

Tasks		Elapsed 	Progress	Time Left
1		2:33h		19.4%		~10:36h
3		1:49h		14.2%		~11:00h
7		1:38h		12.5%		~11:26h


All tasks reported 100% complete maybe first five minutes, then dropped to 0% and started counting. CPU usage was that time 1-2%, then dropped to 0.1 or less
19) Message boards : Number crunching : Server is out of disk space (Message 1194)
Posted 20 Jul 2021 by WezH
Post:
How hard it is to fix storage problems? Or does Project administrator even care?
20) Message boards : Number crunching : Server is out of disk space (Message 1178)
Posted 23 Jun 2021 by WezH
Post:
And again...